Step by step
04
Step by step
Plan ten areas of your restaurant opening
01
Operating plan
Guide 1 · Ch. 1 / Tool 1
Define the menu, cooking methods and service
02
Site checks
Guide 1 · Ch. 2 / Tool 2
Collect records and resolve site questions
03
Lease terms
Guide 1 · Ch. 6 / Tool 6
Review terms and open conditions before signing
04
Design brief
Guide 2 · Ch. 2 / Tool 2
Assemble operating needs and design inputs
05
Plans and permits
Guide 2 · Ch. 5 / Tool 5
Confirm submissions, review steps and dependencies
06
Bids and contract
Guide 3 · Ch. 2 / Tool 2
Compare bids on the same scope and documents
07
Construction
Guide 3 · Ch. 4 / Tool 4
Use the contractor’s schedule and delivery dates
08
Inspections
Guide 4 · Ch. 2 / Tool 2
Track inspection, correction and reinspection steps
09
Opening approvals
Guide 4 · Ch. 3 / Tool 1
Confirm required approvals with each local office
10
Handover and care
Guide 4 · Ch. 6 / Tool 7
Record punch items, handover and service needs
Use project dates, not a standard duration
Use this as a planning map; confirm the required sequence and dates with your project team and local
agencies. On page 64, ON Seafood compares Sites A, B and C using three months for design and
permitting, four for construction and one for opening preparation. Those are exercise assumptions, not
standard durations. Check delivery conditions, permitting progress and lead times before setting your
own dates.