Restaurant Site Selection and Lease Preparation · 3 / 5

Restaurant Guide 1, page 71: What the subtotal includes and still leaves out

Chapter 6 · Put lease terms into the budget and schedule

71

Step by step

What the subtotal includes and still leaves out

The figures compare one operating plan across three sites. They are example assumptions, not actual quotes or a ceiling on the funds required.

01

A · $47,000 of extra work

This is a placeholder allowance outside the $220,000 base scope. Get itemized scopes and quotes and check for overlap. The $494,000 subtotal includes this amount and $40,000 of operating reserves. The $108,000 TI allowance has not been deducted. The $60,000 equipment allowance is separate from the $47,000 extra-work allowance. No additional impact fee is assumed for A’s existing restaurant use; it is not a verified zero until the agency confirms it.

02

B · $90,000 fee and gas range

The $90,000 change-of-use fee appears once in its own row. The subtotal before extra gas work is $690,500; adding $15,000–$30,000 gives $705,500–$720,500. Additional rent and NNN while awaiting gas and other unpriced work remain outside this range. Site B’s $90,000 is a planning assumption, distinct from the actual project’s approximately $150,000 charge.

03

C · $655,000 plus unknowns

This adds priced assumptions, including $450,000 base construction. Change-of-use fees and extra work remain unpriced and cannot yet be added. They are not free. Do not treat this subtotal as a favorable final comparison until those costs are checked. C’s base-construction assumption is higher than B’s because it includes demolition of the old interior and extensive system replacement.

Spending and required funding differ

Operating reserves are cash set aside for opening, not an amount already spent. Put actual payment and TI receipt dates in order, review delay and contingency costs separately, and identify the greatest funding shortfall. Keep blanks marked unverified and record each quote’s date and scope.

Check whether another line already includes it

Review legal and CPA fees, alcohol applications and opening food stock. Also allow for pre-opening training, utility deposits, POS and communications. If a cost is already inside miscellaneous or equipment totals, show the breakdown without adding it twice.