Restaurant Guide 1, page 86: Turn your records into a one-page handoff

Step by step

86

Step by step

Turn your records into a one-page handoff

This handoff concerns ON Seafood’s Site A . Even in one summary, make each recipient’s request explicit.

Site A summary for the landlord and designer

Which operation and space?

Seafood boil / 100 indoor seats desired / Site A address, suite and area. Attach the operating plan and site photos. (Tools 1 and 8)

Facts and open questions

Hood/nameplate photos obtained. Reuse for the new menu and modification scope remain unverified. (Tools 3 and 4)

Ask the landlord

Request prior approved drawings, maintenance records, building restrictions and required landlord consent; state the requested reply date. (Tool 9, Reply log)

Ask the designer

Using the same menu/equipment list, ask whether the site is suitable, what further review or work is needed and what documentation is missing. (Tools 4 and 9)

After replies arrive

Organize findings, cost and payer, then ask the lease attorney about contract wording/deadlines. Technical replies and legal review are separate. (Tools 5 and 6)

Prepare a separate Site B summary

Use B’s address and suite and identify it as a new space without a kitchen. Ask about new systems, available utilities and change-of-use review instead of existing-hood documentation. Do not reuse A’s photos and replies as proof for B.