Restaurant Guide 1, page 4: The restaurant-opening journey in ten steps

Step by step

04

Step by step

Plan ten areas of your restaurant opening

01

Operating plan

Guide 1 · Ch. 1 / Tool 1

Define the menu, cooking methods and service

02

Site checks

Guide 1 · Ch. 2 / Tool 2

Collect records and resolve site questions

03

Lease terms

Guide 1 · Ch. 6 / Tool 6

Review terms and open conditions before signing

04

Design brief

Guide 2 · Ch. 2 / Tool 2

Assemble operating needs and design inputs

05

Plans and permits

Guide 2 · Ch. 5 / Tool 5

Confirm submissions, review steps and dependencies

06

Bids and contract

Guide 3 · Ch. 2 / Tool 2

Compare bids on the same scope and documents

07

Construction

Guide 3 · Ch. 4 / Tool 4

Use the contractor’s schedule and delivery dates

08

Inspections

Guide 4 · Ch. 2 / Tool 2

Track inspection, correction and reinspection steps

09

Opening approvals

Guide 4 · Ch. 3 / Tool 1

Confirm required approvals with each local office

10

Handover and care

Guide 4 · Ch. 6 / Tool 7

Record punch items, handover and service needs

Use project dates, not a standard duration

Use this as a planning map; confirm the required sequence and dates with your project team and local

agencies. On page 64, ON Seafood compares Sites A, B and C using three months for design and

permitting, four for construction and one for opening preparation. Those are exercise assumptions, not

standard durations. Check delivery conditions, permitting progress and lead times before setting your

own dates.