Chapter 3 · What existing systems can you reuse?
36
From the field
Flag untested equipment in the lease and the budget
FROM THE FIELD · A REAL PROJECT
On real projects, repairs to refrigeration and freezer equipment left in a space mostly ended up as the tenant’s cost. Leases are often signed as is, and landlords generally do not want liability for equipment left behind. Treat leftover equipment as a risk you are taking on, not as free equipment, and confirm how your own lease handles it before you sign.
Delivery Date
·
The date the premises are delivered in the agreed condition; document access, keys and condition.
01
Test performance before signing
Power the equipment on and check that it reaches and maintains the set temperature. A running compressor is not proof of refrigeration or freezer performance. Have a qualified technician confirm safe test conditions.
02
Ask for three lease options
Accept the equipment as is after confirming it works; ask the landlord to warrant that it works on the delivery date; or have the landlord remove equipment you will not use. Have your lease attorney put the agreed equipment, date and responsibility into the lease.
03
If the landlord says no, budget the cost yourself
If the landlord declines a warranty or removal, include repair and disposal costs in your budget. Do not subtract support you only hope to receive.
Check that the temperature holds
Record the performance your operation needs and the test results; review contractual responsibility separately. Budget as if untested equipment were not available.
Companion workbook · Tool 3 | Existing systems review
Leave unknown repair costs blank in Tool 7 and note that they are unverified in Evidence / verification status. Record who does and pays for the work in Tool 5.