Chapter 4 · Requests and replies
29
Chapter 4 · ON CAFE worked example
Tool 3 ·
Questions and replies
ON CAFE uses each reply to find the next question
Sending a request does not verify every condition. Read each reply alongside its next action. The milestones show the sequence, not a promise to finish within a set number of days.
| Milestone and contact | Question sent | Reply and current status | Next actions |
|---|---|---|---|
| After selecting a site Broker to landlord | Request drawings, occupancy records, equipment list and delivery terms | Existing records and some terms received. Equipment operation and lease incentives remain unverified. | Before reviewing for signature, request the remaining equipment list, work scope, TI and rent-abatement terms in writing. |
| After sending the plan Designer | Request electrical, plumbing, exhaust and use review | Initial reply calls for an electrical load calculation and planning/sewer authority checks. | Send oven and water-heater specifications and site photos. Agree on a response date. |
| After a joint site visit Designer and contractor | Check labels, dimensions, existing systems and major work items | 200A label photographed. Water-heater fuel options, grease control and restroom questions identified. | Obtain the designer's work scope, then ask the contractor for pricing with inclusions and exclusions. |
| After a reconnection inquiry Electric utility | Ask about the account, reconnection inspection and upgrade process | In this example, account transfer and an inspection are required; an upgrade needs a separate application and review. | Assign the application task. Confirm costs and lead times with the designer and electrical contractor. |
| While considering the water-heater change Gas utility and designer | Ask about supply and piping for a gas option | Not yet contacted. No reply received. | Send specifications with the inquiry. Agree on and record an actual response date. |
How to use an initial reply that capacity "may be tight"
ON CAFE requests a load calculation instead of treating a shortage as confirmed. After comparing both water-heater options, it puts the selected option's systems and construction scope into the plan and budget. It does not record a future gas-utility inquiry as a reply already received.
Replies in this example are reconstructed for teaching. In your own log, record request and reply dates, the respondent, and supporting emails or drawings.