Back to product details

Your First U.S. Business Space · 5 / 9

C0 English edition 18 · ON CAFE's one-page operating plan

Chapter 2 · My business requirements

18

Chapter 2 · ON CAFE worked example

Tool 1 ·

Operating plan

ON CAFE's one-page operating plan

ON CAFE wrote this plan before evaluating the site. Unknown conditions appear as questions in the right column. Highlighted items 3 and 5 are affected by the proposed water-heater change.

Change note · Comparing electric and gas options

The original plan used an electric water heater. A gas option is now under review. Item 3, simultaneous use, and item 5, equipment, are marked. Compare supply, piping, exhaust and installation costs before choosing.

ItemON CAFE's planSpace and systems neededQuestions still open
1 ActivitiesMake drinks, display delivered pastries, warm food in an electric oven. No frying or grilling.Bar counter, washing area, oven spaceWhat exhaust and health requirements apply to the menu and oven?
2 Customers20 indoor seats and takeout. Four outdoor seats desired.Seating and pickup waiting areaWhat occupancy and restroom requirements apply?
3 Simultaneous useEspresso machine, oven and water heater run alongside refrigeration and ice equipment.Electrical and hot-water supplyWhat is the total electrical load, including existing systems?
4 StaffThree staff at peak times; two otherwise.Staff circulation and storageWhat requirements apply to staff areas?
5 EquipmentSeven types of electric equipment, nine units. Water-heater fuel change under review.Power, water, drainage and exhaust connectionsNeed oven and water-heater specifications and a comparison of both options.
6 StorageChilled milk; dry beans and packaging. No frozen storage.One refrigerated display, two undercounter refrigerators, shelvingDoes capacity and space match the storage volume?
7 WasteGrounds, wash water and packaging waste.Drainage treatment and waste collection routeWhat grease-control and collection requirements apply?
8 Special conditionsNo alcohol. Four outdoor seats, signage and early deliveries desired.Outdoor area, signs, delivery routeWhat landlord consent, agency approvals and delivery hours apply?

1

Tool 1 ·

Operating plan

Complete all eight areas with your conditions. Explain any changes you make. Whether the space supports this plan still needs separate verification.

PREVIEW · C0 · 9 / 43