FR2 ·
Getting started
02
FR2 ·
Getting started
Open the stage you need now
Even when designers and contractors handle the technical work, owners must connect documents, decisions and replies. Use the table for your stage and turn unknown conditions into questions.
Using this PDF Print the pages you need, or use a PDF app's text/pen tools and save the annotated copy. There are no fill-in fields. Keep the original; name each copy by address and date. Start with one row in the table you need now.
01 Before the design brief
p. 4
Send the operating plan and equipment information to the designer
02 Before agency submission
p. 5
Confirm authorities, submittals and owner decisions
03 Before requesting bids
p. 6
Compare pricing and responsibilities for the same scope
04 Before construction
p. 7
Check required permits, contracts and delivery conditions
05 Inspections and changes
p. 8
Record the basis for inspections, changes and payments
06 Final inspections
p. 9
Verify passing records and remaining approval/handover conditions
How to read the tables
Read from what to prepare → who handles it → evidence to keep . Receiving a document does not mean all required review is complete. Use the progress log near the end to record the next action and follow-up timing.
This material provides general education, not advice determining site approvals, system suitability or a contract's legal effect. Verify actual requirements with the relevant authorities and qualified professionals. Permit names, sequences and durations vary by address and work scope.
Use the progress log on page 12. For handover preparation, see page 9 and FR3.
PREVIEW · FR2 · 4 / 13