Confirm what goes to each authority

Ask your designer to explain the decisions you must make and each agency's submission process, rather than trying to interpret all the drawings alone.

What to prepareResponsible personEvidence to keep
Planning, building, health, fire and sewer review routesDesignerApplication and review list by authority
Change of use and possible additional chargesDesigner and relevant authorityReplies on the current plan and costs to verify
Equipment and system conditions shown in drawingsOwner and designerMatched requirements, gaps and information still needed
Menu, seating, equipment and kitchen layoutDesigner and health departmentRequired health-review submittals
Hood suppression, sprinklers and related systemsDesigner and fire authorityWhether separate submissions or vendor design are required
Grease control and drainageDesigner and sewer authorityWritten new-installation, replacement or retention requirements
Landlord drawing approval, if required by the leaseOwner and landlordWritten approval scope and conditions
Agency submission and expected review timingDesignerTracking number, drawing date/revision and next follow-up date

When given a duration, also ask what could delay it.

In practice · Field experience

A building where design took six months

A narrow duct shaft in a new commercial building required additional design and structural review. At this site, drawings took six months and construction then took 16 months.

Your next action

Ask about recent projects with similar local conditions and work scope. Check how unresolved routes and your decisions may affect this project's schedule.

Reconstructed from field experience for teaching. Image is an explanatory illustration.