Restaurant Design, Construction and Opening Readiness Checklist

Before the design request, before agency submittal, before the bid request, before construction starts, during mid-construction inspections and changes, and at final inspection — what to prepare at each stage, who handles it, and the signal that the stage is done.
- Use this when
- When tracking design, agency submissions, bids or construction and what comes next.
- Have these ready
- Available drawings, written replies, bids or contracts, and the people responsible.
- What you’ll put together
- A progress record with each status, responsible person, next action and due date.
PDF · 13 pages · 1.0
What you complete with this checklist: the documents and owners for each stage, and a progress log with one line per agency or vendor. Agency reviews are recorded in five statuses — submitted, commented, approved, issued, inspection passed — and work such as contracts, orders, deliveries and handover in four: not started, in progress, done, not applicable. Even when the designer and contractors run the process, the owner needs to know what was submitted, what was flagged, and what was issued.
OPEN NOTE / 01
The questions this checklist organizes
The owner's job is not to interpret code. It is to know the state of the current stage and what the next one needs. Record agency reviews in five statuses — submitted, commented, approved, issued, inspection passed — and contracts, orders, deliveries and handover in four — not started, in progress, done, not applicable — and you can ask for the document instead of accepting "the permit came through." One agency's approval is not approval from all of them, and neither "not started" nor "not applicable" is ever read as approved.
OPEN NOTE / 02
What is inside
- The five statuses an owner tracks
- Before the design request — what to hand the designer
- Before submittal — what to ask even if you cannot read drawings
- Before the bid request — the same scope to every contractor
- Before construction — permits, contract and utilities
- Mid-construction inspections and changes — a flag is a record, not a failure
- Final inspection — and then the roadmap
- Who to ask for what, and a one-page progress log
OPEN NOTE / 03
What comes next
Fill in the table for your current stage — agency lines in the five statuses, contract, order, delivery and handover lines in the four. For every item that is not finished yet, write down who owns it and the next step with its due date. The approvals and handover documents left after final inspection continue in the opening roadmap.
Get it free
PDF · 13 pages
Explore the next stage
See the scope and publication status of the design, permits and construction guides.
View the restaurant series- Version
- 1.0
- Edition
- English edition
- Last reviewed
- 2026-11-04
- Pages
- 13 pages
- Language
- English
- Stage
- Build
- Collection
- Opening a Restaurant