Restaurant Site Visit and Pre-Lease Checklist
Organize what to check on site and ask before signing a lease.
Get by emailPractical notes for opening your business
From choosing a space and signing a lease to construction and opening day. Practical notes answer the questions you meet along the way. Start with a note, go deeper with a guide, and build your own plan.

A question to start with · Before signing a lease
START WITH A QUESTION
Before signing a lease
The existing setup served a different menu and different equipment. Check what works for your operation and what needs to change before you commit.
Read the note →FREE RESOURCES
Start with a checklist you can use on your next site visit or project.
Organize what to check on site and ask before signing a lease.
Get by emailTrack the documents and contacts you need at each stage.
Get by emailFind your current stage, from choosing a space to opening day.
Get by emailRegister and confirm your email once to receive all 3 free checklists. Updates about new resources and notes are optional.
OPEN NOTE GUIDES
From choosing a space to getting ready to open. Preview the pages and choose the depth you need.

YOUR STARTING POINT
From the search for a space to your first meeting. Follow six chapters and the ON CAFE case to outline your operating plan, site questions, budget and schedule. The guide and tools 1–6 cost $9.99 together and are included with an restaurant series purchase.
$9.99 · PDF + Excel
Contents and preview →Included with any restaurant guide or bundle. No separate purchase needed.
Each restaurant guide or bundle includes the introductory guide and workbook.
View the introductory guide →Prices in USD. Applicable taxes are shown at checkout.
OPEN NOTE LIBRARY
A quick note, a practical checklist, or a guide that goes deeper.
43 resources
Your questions help us plan future notes and guides.
FIELD NOTES

Note · 5 min read
A hood and walk-in cooler are still in the space. Find out what comes with the lease, what fits your menu and what it would cost to restore the space after changes.

Note · 3 min read
One bid includes restoring the floor after the pipes go in. The other mentions only the plumbing. Ask both contractors where their work ends before comparing prices.

Note · 3 min read
The equipment deposit and a construction payment may fall in the same week. Check the balance on each due date, especially if your landlord reimburses you later.
OPEN NOTE SHORTS
NEW1:42Latest on social
Separate advertised rent from your monthly operating budget. Review base rent, separate charges and included expenses without counting the same cost twice.
Watch and keep reading →
0:50Open Note Shorts
A sandwich shop and a fried-chicken restaurant can need very different equipment. Before signing, gather the existing plans, equipment details and approval records, then compare them with your own menu and equipment specifications.
Watch and keep reading →
1:44Open Note Shorts
In this illustrative comparison, Quote A starts at $180,000 and Quote B at $199,000. After matching equipment connections, finish repairs and allowances, A becomes $205,000. Compare the same scope before comparing prices. These are example amounts, not market estimates or a quote for your project.
Watch and keep reading →
YOUR WORKSPACE
Turn what you read into your own business records. Continue with the tools included in your purchases and the documents you have saved.
Open your workspace ↗Use it in your browser. Installing the app is optional.Space and equipment
Questions before signing
Budget and timing
Add what you need to check.
Illustrated screens · Continue with the same account
One short suggestion is enough. Prepare your message below, then review and send it in your email app.