The short note
The landlord has seen your menu and says a restaurant is fine. Ask where the draft lease permits that use. Whether you can prepare and serve that menu at this address is a separate question for the local offices.
The building can have its own conditions. The lease may allow cooking while a new exhaust duct through the roof still needs the landlord’s approval. Ask the design team whether the existing hood can serve your equipment layout.
Write the expected reply date beside the lease notice deadline. If the reply will arrive too late, ask your lease attorney what protection or extension you can request.
What to check
Before you sign, you should be able to mark every line below as verified or unverified. The point of the list is to keep an unanswered item from quietly becoming a "no problem."
- Permitted use — the permitted-use language in the lease and the zoning, building and health answers for that specific address and suite are different things. Write down your menu, cooking methods, seat count, delivery, alcohol and hours first, then ask against that.
- The clauses to find first — permitted use, term and options, base rent, additional rent, delivery condition, rent start, TI, repair, insurance, guarantee, assignment.
- Power, gas, water and drainage — compare the existing service against your equipment spec sheets. A visible panel or meter is not proof of capacity; ask what an upgrade would cost and how long it would take.
- Hood, fire suppression and grease — check whether your new menu and equipment layout fit the existing systems. An existing service tag or grease interceptor is not a decision to reuse them.
- Landlord approvals and common areas — roof penetrations, exterior equipment, signage, parking, trash and delivery routes, construction hours and restoration. Find out who approves each one and who pays to put it back.
- Inspection rights and deadlines — access and inspection rights, the due-diligence period, how notice has to be given, and the terms for extending or walking away. A slow answer from a consultant does not extend a contractual deadline.
Why it matters
A lease and a permit don't wait for each other. The lease is an agreement to rent space. The approvals you need to operate are decided separately, by the agency with jurisdiction, based on the address, the use and the code. A landlord's verbal confirmation doesn't substitute for that decision.
So if the lease has no due-diligence period and no permit contingency, rent can start on the date in the contract even while your permit is still moving. And rent commencement is not automatically your opening day. What triggers it — a fixed date, delivery of the space, or the end of a set period — differs from lease to lease.
The same logic applies to leftover equipment. "It's already here" is a list of things to verify, not a discount. Until you price the repairs, removals and replacements alongside it, you don't know whether this is the cheaper space. A lower base rent can flip once repair obligations and additional rent are included.
Questions to ask
These are written so you can send or say them as-is. Record who answered and on what date.
Landlord / Broker
- Can you send me the proposed permitted-use language as written? I want to re-check it against my menu, cooking methods, seat count and hours.
- Can I get a copy of the existing Certificate of Occupancy for this suite, along with any prior permit and equipment records?
- Can you confirm the delivery condition and the scope of landlord work in writing? Where does landlord work end and my work begin?
- Who approves roof penetrations, exterior equipment, signage and the trash enclosure — and who is responsible for restoring them later?
- Which of these can't you answer today, and who will get back to me by when?
Zoning / Building / Health department
- Is a restaurant with [menu, cooking method, seat count] allowed at this address and suite?
- What application and review process does this use require, and how is the parking requirement applied here?
- I'd like to keep a record of this answer — may I note your name and today's date?
Architect / MEP engineer
- Based on my equipment list and spec sheets, what can't you determine about this space yet?
- Should the existing hood and grease systems be treated as reuse, modify, replace or unverified — and what would you need to decide?
- If the service has to be upgraded, which step drives the schedule: design, permitting, utility coordination, installation or restoration?
Attorney
- Does this draft include a due-diligence period and a permit contingency? If not, what language could I ask for?
- If the permit doesn't come through within that period, what are my options under this lease?
- What triggers rent commencement, and does that date move if delivery or permitting is delayed?
- How far does the personal guarantee extend, and for how long?
Before you sign
Put it on one page before you sign. Use the same order at every space and the candidates become comparable.
- Pick the three biggest unverified items. For each one, write down who answers it, what evidence you need, and the date you expect it.
- Check those dates against your due-diligence, notice and signing deadlines. A late answer doesn't move a contractual date.
- Don't turn "unverified" into "fine" before the evidence arrives. Recording what you don't know is a real due-diligence result.
- Translate TI and free rent out of dollar amounts and into two things: what you have to pay out first, and the day rent starts.
- Then commit to one next decision — proceed, renegotiate, extend diligence, or walk.
Before signing, identify the critical open items and contractual deadlines. If verification remains outstanding, review the protective terms and next steps with your contract adviser.