The short note
Tables and chairs are ready to ship. The site only has finishes such as painting and lighting left. Would early delivery help opening preparations? Less work remaining does not mean there is space to store boxes. Coordinate the order of arrivals before confirming shipment.
What to check
- Construction needs versus operating supplies: distinguish items required for installation from chairs, dishes and other opening supplies. They need not all arrive together.
- Quantity and package size: send box counts and packed dimensions rather than product photos alone. The team needs to understand the storage footprint.
- Site readiness: ask about remaining wall and floor work, protection or curing requirements and work routes. Do not invent a waiting period for a particular finish.
- Receipt and delay terms: confirm the receiver, damage-reporting process, photos and redelivery or storage charges with the supplier. Confirm site acceptance before fixing the delivery date.
Why it matters
For illustration, chair boxes placed against an unfinished wall must move before painting. Protecting and moving the new items becomes another task. In contrast, built-in pieces may be needed for subsequent work. Assign a reason to each arrival date instead of delaying everything.
Do not assume the contractor takes responsibility for all storage because a delivery date may change. Storage, movement and damage checks need to match the agreed scope and any separate arrangement.
Questions to ask
Ask the construction team and supplier
- From which date can the site receive these items and this number of boxes, and where?
- Can we agree on a location and movement responsibility that will not block remaining work?
- What are the rescheduling, storage and redelivery terms if the site is not ready?
Your next step
If the chairs are due Friday, ask the construction lead when they can be unloaded and where they can sit clear of painting. Confirm who will receive them before booking delivery. If the dates no longer work, ask the supplier about storage and redelivery charges.