The short note
In a fictional ON CAFE project, an ice machine fits the available width. Power, water, drainage and service clearances remain unchecked. “It fits” is only part of the ordering decision.
What to check
- Exact model: collect its model number and specification sheet. Update the review package when a candidate changes.
- Installation conditions: ask the designer and installer to review applicable clearances, power, water and drainage against manufacturer requirements. Do not make the capacity determination yourself.
- Delivery route: check doors, corridors and the route to the final location with delivery and installation providers.
- Responsibilities: ask who covers shipping, indoor placement, installation, connections and startup.
Why it matters
FDA’s plan-review guidance treats equipment location and system specifications as matters to review before purchases. Late questions about utilities or drainage can require a new equipment or layout review.
Official reference: FDA — Food Establishment Plan Review Guide
For a substitute model, compare connection requirements and clearances as well as dimensions. Get order-change, cancellation and return conditions separately from the supplier.
Questions to ask
Ask your supplier, designer and installer
- Can you review this exact specification sheet against the proposed location and existing systems?
- What remains unresolved before ordering, and who handles each step from delivery to startup?
Your next step
Record the model, specification-sheet location, open conditions and responsible contacts. Do not open electrical panels or operate utilities to investigate. Match the confirmed information to the order, then review lead time and ordering terms with the supplier.







