The short note
Inspiration photos show a look. They do not explain your food preparation, equipment connections or unresolved decisions. Those gaps can leave a first design meeting circling around the same questions.
What to check
- Operating brief: include the menu, preparation methods, service and staff activities.
- Equipment candidates: include model numbers and manufacturer specification sheets, not just shopping links. Label candidates as unselected.
- Space records: attach available drawings and photos with the address, unit and date received. Flag dimensions or existing conditions that have not been verified.
- Questions: distinguish settled decisions from open items. Put the answers needed for this meeting first.
Why it matters
FDA’s plan-review guidance explains the value of checking equipment layouts and electrical, mechanical and plumbing specifications before purchasing and installation. A specification sheet is a basis for review, not evidence that you have already ordered the item.
Official reference: FDA — Food Establishment Plan Review Guide
Questions to ask
Ask your designer
- Which parts of this package need field verification or additional records?
- Which equipment decisions must come first because they affect the layout or building systems?
Your next step
Put a one-page cover note on the package: “current plan / open decisions / answers needed.” After the meeting, assign each missing item to a person and a follow-up date. You do not need to produce the designer’s drawings yourself.
If you have not hired a designer, use this as a question sheet for site visits. Share the verified records and open questions when your design professional is appointed.







