Skip to content
Notes

N13

Who pays the roofing contractor the landlord requires?

Clarify scope, quote approval, payment and scheduling when the landlord requires a particular contractor. Keep the handoff between teams explicit.

4 min read · Build · By Open Note USA Editorial Team

A duct curb and flashing on a commercial roof
AI-generated image for illustration.

The short note

While planning kitchen work, the landlord says roof work must go through a designated contractor. Can you remove that cost from your budget? Selecting the contractor and paying the bill are separate questions. Get the requirement in writing and compare it with your construction quote.

What to check

  • Required or recommended: ask which work is covered and whether alternatives can be approved. Obtain the building work rules and relevant lease attachments.
  • Scope boundaries: for example, identify who coordinates the location, roof penetration, weatherproofing and indoor duct connection. This is a coordination list; qualified teams determine the method.
  • Billing route: establish whether you contract directly, pay through the general contractor or receive a property-management charge. A vague “by others” can disappear from the budget.
  • Readiness and completion: record prerequisites for the visit, who books it, what confirms completion and who handles later concerns.

Why it matters

Consider an illustrative situation: indoor ductwork can connect next week, but no roof visit has been booked. Both teams may be ready for their own scope while the handoff remains unscheduled. The owner need not make the technical decision; connect the responsible people and establish the prerequisites.

Also ask why a designated contractor is required. If the answer refers to a warranty or building rule, request the document and the work it covers. Turn “the landlord’s contractor will handle it” into a defined scope, cost and date.

Questions to ask

Ask property management and your contractor

  • Which work requires this contractor, and what establishes payment responsibility?
  • What is already included in our quote, and what will the designated contractor bill separately?
  • Which prerequisites need coordination, and when can the teams schedule the handoff?

Your next step

Compare the quotes for duplicate coverage and gaps. Share the response and contacts with the construction lead for technical coordination and scheduling. If payment responsibility conflicts with lease wording, resolve that with your lease adviser before ordering the work.

Version v1.1 · Published 2026-10-11 · Last reviewed 2026-11-06

Tell us what was unclear or what you need nextShare feedback

One short suggestion is enough. Prepare your message below, then review and send it in your email app.

Please leave out personal details, order numbers and private download links. This page does not send or store your entries on a server.

hello@opennoteusa.com · Privacy policy

Find my next step

1 / 3

Answer three questions and we'll point you to resources and first steps that fit where you are.

What kind of space are you preparing?