RESOURCES
Resources
Guides, free checklists, notes, and videos in one place. Pick the stage you are in — from planning and choosing a space to build-out and opening — or narrow it down by line of business, topic, and format.
Build
Design and permits, bids and construction.
17 library items

Will you have the cash when the construction bills come due?
The equipment deposit and a construction payment may fall in the same week. Check the balance on each due date, especially if your landlord reimburses you later.
3 min read
Read the note
What should you bring to the first design meeting?
Bring the look you like, the menu you plan to serve and the models you are considering. Mark open choices so the designer can tell you which decisions affect the layout first.
3 min read
Read the note
The ice machine fits. Is it ready to order?
Check more than the width. Use the exact model and installation manual to ask about connections, service clearance and what the delivery crew will do.
3 min read
Read the note
Do both plumbing bids include putting the floor back?
One bid includes restoring the floor after the pipes go in. The other mentions only the plumbing. Ask both contractors where their work ends before comparing prices.
3 min read
Read the note
Who pays the roofing contractor the landlord requires?
Clarify scope, quote approval, payment and scheduling when the landlord requires a particular contractor. Keep the handoff between teams explicit.
4 min read
Read the note
Before adding a table, walk through a busy kitchen shift
Equipment can fit on a plan while open doors and busy staff compete for space. Walk your designer through how the kitchen will actually work.
4 min read
Read the note
Moving an ice machine starts with checking its connections
A nearby drain does not establish a suitable connection. Review the new location, equipment model and completed work before moving the machine.
4 min read
Read the note
What should the owner check during a site visit?
Agree on checkpoints with the construction lead. Track completed work, upcoming work and owner decisions without taking over trade supervision.
4 min read
Read the note
Only finishes remain—can all the furniture arrive now?
Match the supplier’s delivery date to the site’s readiness. Agree what can arrive, where it can go and who will receive it.
4 min read
Read the note
If the new counter replaces a cabinet, where is the credit?
Show added and removed work in the same change record. Separate proposed amounts from approvals, and track the net price and schedule effect.
4 min read
Read the note
The second construction invoice is here. What are you paying for?
Compare each request with the payment terms, supporting records and prior payments. Distinguish advances, progress billing and material charges.
4 min read
Read the note
A large space can still have a difficult equipment delivery route
Check the delivery route separately from the installation footprint. Record packed dimensions, entry openings, turns and the final location.
4 min read
Read the note
Delivery Included Does Not Mean Ready to Use
Unloading, moving equipment indoors, placement, utility connections and commissioning can be separate scopes. A liftgate gets equipment from the truck to the ground; it does not automatically include indoor placement. Confirm who handles each step and when before ordering.

The Cheaper Quote Became $6,000 More Expensive
In this illustrative comparison, Quote A starts at $180,000 and Quote B at $199,000. After matching equipment connections, finish repairs and allowances, A becomes $205,000. Compare the same scope before comparing prices. These are example amounts, not market estimates or a quote for your project.

Cooler to Freezer: More Than a Motor Swap
An existing walk-in cooler may need more than a different refrigeration unit to work as a freezer. Review the walls, floor, door, refrigeration and defrost system, and electrical requirements with the manufacturer or a refrigeration professional before pricing a conversion.

The Neighbor Is Open. Is Your Space Approved?
One unit had been divided into two without the required permits. The neighboring business was operating, but that did not establish approval for the new space. Request records for the dividing work and the exact unit you plan to use. The lease outcome described here depended on that particular contract.
Paid guides for this stage
- Restaurant Design, Permits and Construction Preparation
Prepare a design brief, drawing questions, budget and payment plan, then request comparable bids.
- Choosing a Contractor and Managing Construction
Compare contractors and bids, then connect site questions, changes, invoices and payments.